Purpose Lack of alarm configuration can lead to alarm flooding causing increased outage minutes or Network Operator error. This document is to outline a philosophy of alarm and Read More
The Wellington PowerOn Fusion SCADA configuration was created during the initial system migration. The SCADA component of the PowerOn Fusion system was not cut-over and the Read More
Synerty was contracted by Ausnet Services to support a new PowerOn Fusion implementation project. Synerty provided a senior DMS/SCADA architect and a DMS integration engineer. Read More
GE’s NMS inFusion is a spatial layout assistant which allows cartographers to quickly schematise distribution network diagrams before being loaded into PowerOn Fusion. Read More
Synerty was engaged by GE Energy to develop a migrator capable of migrating Energex’s GENe SCADA systems single line diagrams to GE Energy’s migration platform. The Read More
Synerty was awarded the project to develop an iPad extension to PORT, called iPORT. Field engineers are assigned well rounds to ensure the accuracy of telemetered production data Read More
WEL Networks has engaged Synerty to perform the system integration work for their PowerOn Fusion 5.1.4 upgrade project. Synerty has built the entire production environment in a Read More
Synerty received an engagement from Orion to build their upgraded v5.2 PowerOn Fusion environments from bare metal. During this project we have, built environments, collaborated Read More
Synerty was awarded the project to build and supply a SCADA HMI that runs on an iPad. Santos has a large number of gas wells in New South Wales, Australia. The aim of this iHMI Read More
Synerty was awarded the contract to upgrade WEL Networks PowerOn Fusion production and dev environments to v5.2.2. This involved : Virtualising the existing production environment Read More